Chat

Renovation & Fit-Out Snagging

Check the work
before you pay.

Your contractor says the work is done. Before you sign off and release the final payment, an engineer checks the workmanship, materials and finishes, and lists each shortfall for the contractor to correct.

Request an inspection

DubaiAbu DhabiRas Al Khaimah

For
Owners whose renovation or fit-out is finished
Book
When the contractor finishes, before the final payment
You get
A photo list of shortfalls for the contractor to correct

The final payment

Once it’s paid,
it’s harder to ask.

While part of the contract sum is still outstanding, your contractor has every reason to come back and put things right. Once it’s paid, each return visit depends on goodwill. That is why the inspection belongs between ‘finished’ and ‘paid’. Our founders spent years on the developer and contractor side of delivery, so the list is written the way a site team closes out a job: room by room, most urgent first.

  1. 01

    Defects hide at the joins

    Tiler, joiner, painter and plumber each finish their own part. Gaps, open joints and missing sealant sit where one trade meets the next.

  2. 02

    New work meets old

    A renovation ties new finishes to existing walls, floors and pipes. Levels, colours and connections along those edges deserve a close look.

  3. 03

    Fresh finishes flatter

    New paint and clean grout look right on the day. A hollow tile, a fall towards the wrong corner or an uneven floor takes a tool to find.

How it works

Inspect first.
Pay last.

  1. 01

    Works finished

    The contractor says it’s done. Book us once the site is clear of tools and debris, before any sign-off or payment.

  2. 02

    Send the details

    Share the contractor’s quotation, drawings and finish schedule, so we check the work against what was agreed.

  3. 03

    Inspection

    An engineer checks the finished work room by room: tiling, levels, joints, joinery and the services touched.

  4. 04

    Report within 24 hours

    Identified shortfalls photographed, located and prioritised, ready for the contractor to correct.

  5. 05

    Corrections

    The contractor works through the list and tells you when it’s done.

  6. 06

    Re-inspection, then pay

    A re-inspection, as set in your quotation, confirms what was corrected before the final payment.

Tile by tile

Hollow tiles don’t show.
We check for them.

A tile can look perfect and still be hollow underneath, which is how cracks and loose tiles start. We check the floors with hollow-tile detection and mark each one we find on the report.

0 hollow tiles marked for the contractor

What we check

Tiling, levels and joints first.

Ordered for finished works: the surfaces a renovation changes most, then joinery, then the plumbing and electrics the contractor touched.

01Interior finishes & wet areas

  • Tiles & stoneHollow areas, chips and visible repairs in new tilingHollow tile detection
  • Levels & alignmentFloors, walls and tile edges out of levelSpirit level
  • Grout & sealantsJoints, skirting and sealant where trades meet
  • Drainage slopesFalls towards the drain in showers and wet areas
  • Cracks & damageNew plaster, ceilings and paintwork

02Joinery, kitchens & appliances

  • Cabinets & wardrobesAlignment, stability and finish of new units
  • Doors & drawersHinges, runners and soft-close operation
  • Worktops & splashbacksChips, cracks, joints and sealant
  • Appliance installationFit, ventilation and accessible connections

03Plumbing & drainage

  • Fixtures & connectionsNew taps, toilets, seals and accessible pipework
  • DrainageFlow from new outlets, with a camera for blockagesDrain camera
  • Leaks & moistureDamp around new wet areas and connectionsMoisture meter
  • Hot & cold waterNew mixers and showers run hot and cold

04Electrical

  • SocketsNew and moved sockets tested for correct wiringSocket tester
  • Safety switchesRCDs / ELCBs trip-tested once the works are doneSocket tester
  • Distribution boardLabels match the circuits after the works
  • Switches & lightsEach one operated

Services are checked where the works included them. The work is measured against your agreement with the contractor and good workmanship practice.

Not the same as handover

New-build snagging vs renovation snagging.

TopicNew-build handoverRenovation & fit-out
Who puts it rightThe developer’s teamYour own contractor
Your momentBefore you sign for the keysBefore the final payment
Where defects clusterAnywhere in a unit nobody has usedWhere new work meets existing, and where trades meet
ScopeEvery room and service in the propertyThe areas and services the works changed
Documents to shareYour handover noticeQuotation, drawings and finish schedule

Every ELUMEX inspection

  • Engineer-led25+ years in construction
  • 2–4 hours on siteVisual, non-destructive
  • Report within 24 hoursPrepared using Onsite
  • Re-inspectionWhere your quotation includes it
View sample report

Frequently asked questions

Questions before you sign off.

Short answers. Anything specific? Message us on WhatsApp.

When should I book a renovation snagging inspection?

Book it when the contractor tells you the work is complete and the site is cleared, and before you sign off or release the final payment. At that point the contractor still has a reason to return, and the corrections can be checked before the money changes hands. Tell us the date the contractor expects to finish when you get in touch.

What do you check the work against?

We check it against what you agreed with your contractor, such as the quotation, drawings or finish schedule, and against good workmanship practice. Send us whatever documents you have when you get in touch. If little was written down, the report still records each shortfall in workmanship, with a photo and its location.

Does the contractor have to fix what you find?

That depends on your agreement with them. The inspection gives you a clear, dated list to raise in writing, with each item photographed and located, so the conversation is about specifics. What the contractor is obliged to do is set by your contract; this is general information, not legal advice.

Can you inspect during the works, before the walls are closed?

This service covers the finished works. If you’d like a visit at an earlier stage, ask us about earlier visits when you get in touch and we’ll tell you what we can offer for your project. In the meantime, photographing pipework and cabling before it disappears behind tiles and plaster is always worth doing.

Talk to us

Tell us about your renovation.

Send the property, its size and what the works covered. We’ll confirm the scope, a quote and a date before your final payment falls due.

Also useful: New-Build Handover Snagging

Chat with us