Blog
Handover, snagging and repairs, explained.
Practical notes from our civil engineers on receiving a Dubai property and getting its defects fixed.
-
015 min read
Dubai property handover checklist 2026: from handover notice to keys
What to prepare, what to check in each room, and which tests need the power, water and AC running, in the order an engineer works.
Read the guide
-
025 min read
What goes in a snag list (with an illustrative sample entry)
One defect per line, a location anyone can find and a fix you can check later. Here is the format, with an illustrative entry broken down.
Read the guide
-
034 min read
After the inspection: how to get the developer to fix your snags
Finding defects is half the job. This is how to get them into the right hands, dated and in writing, and how to close them properly.
Read the guide
Talk to us
Questions about your handover?
Tell us the property, the location and the timing. We’ll take it from there.







